Home > Workshops (WS) > Regional Results Workshops >  South-Eastern Europe

SUSPLAN Regional Results Workshop

SUSPLAN conducted 9 individual regional RES integration scenario studies in different geographical regions across Europe. Each study focuses on the regional characteristics and challenges. 

Characteristics for South-Eastern Europe:

  • Centralized energy system with multiple, obsolete infrastructure
  • Poor efficiency, poor environmental performance and poor security of supply
  • Low prosperity
  • Deregulation at early stage
  • Significant RES potentials
  • Investments in modernization of energy infrastructure 

The SUSPLAN Regional Results Workshop South-Eastern Europe took place:

Thursday, 20th of May 2010, 9 a.m to 3.30 p.m.

UzinExport building
The Multipurpose Conference Hall „Jade"
8 lancu de Hunedoara blvd.
Bucharest 1, Romania

Program

  Welcome and registration workshop  
09.00 Welcome to SUSPLAN project and workshop Cristian Tantareanu, ENERO (Executive Director)
     
  Current concern regarding renewable energy promotion Alexandru Sandulescu (General Director) , General Directorate of the Energy Policy within MECMA
     
  Part I – Presentation of SUSPLAN and overview on results  
     
09.30 Introduction to SUSPLAN results workshop Ingeborg Graabak, SINTEF, Norway (SUSPLAN Coordinator)
     
09.40 EMPS model: methodology, scope Ingeborg Graabak, SINTEF, Norway (SUSPLAN Coordinator)
     
10.00 Methodology in SUSPLAN regional studies & modeling with GreenNet and eTransport Hans Auer, EEG, TU Wien (SUSPLAN WP2 Leader)
     
10.50 Coffee break  
     
  Part II – Presentation of regional results and discussion  
     
11.10 Presentation of scenario results for South-Eastern Europe – Romania: description, premises, first results Christian Tantareanu, ENERO (Executive Director)
     
  Discussions  
     
12.00 Lunch  
     
  Part III – Other interventions, discussion  
     
12.45 Confirmed interventions TRANSELECTRICA, ISPE, Romanian Wind Energy Association, Tractebel Engineering GDF SUEZ
     
  Large scale integration of wind generation in Romanian Power System Dan Preotescu, TRANSELECTRICA
     
  Romanian Hydropower Paul Gheorghiescu
     
  Other intervention, discussions  
     
15.00 Stakeholder participation in the process of development of implementation strategies Dena representative
     
15.15 Final conclusions Ingeborg Graabak, SINTEF, Norway (SUSPLAN Coordinator)
     
15.30 End of workshop  

Settings

Fontsize: A | A+ | A++

Downloads