SUSPLAN Regional Results Workshop

SUSPLAN conducted 9 individual regional RES integration scenario studies in different geographical regions across Europe. Each study focuses on the regional characteristics and challenges. 

Characteristics for the Alpine Region:

  • Same characteristics like Central/ Western Europe
  • Significant storage option due to pumped hydro storage power plants
  • Significant electricity hubs North/ South

The SUSPLAN Regional Results Workshop Alpine Region took place:

Tuesday 03rd of May 2010, 9 a.m to 3:30 p.m.

Verband der Elektrizitätsunternehmen Österreichs
(Association of Austrian Electricity Companies-VEOE)
Brahmsplatz 3
1041 Vienna, Austria 

Program

  Welcome and SUSPLAN project overview  
     
9.00 Welcome Bertram Weiss, Verbund-Austrian Hydro Power AG (Task Leader 2.9)
     
9.10 Introduction to the SUSPLAN results workshop Bjørn Bakken, SINTEF Energy Reseach (Coordinator SUSPLAN)
     
  Part I – Result Presentation of the Alpine Case  
     
9.30 Description and Scaling of 4 different Austrian Storylines on RES Deployment for 2030-2050 Hans Auer, EEG, TU Wien (WP2 Leader)
     
9.45 Modelling RES-Electricity & RES-Heat Deployment from 2030-2050 in Austria for each of the 4 Storylines Karl Zach, Georg Lettner, Hans Auer, EEG, TU Wien (WP2 Leader)
     
10.15 Synthesis of Modelling Results and Implications for the Grid Infrastructure Hans Auer, EEG, TU Wien (WP2 Leader)
     
10.30 Coffee break  
     
  Part II – The Future of Hydro Power in Austria  
     
11.00 Status Quo, Existing and Future Challanges and Remaining Future Potentials of Large Scale Hydro Power in Austria (European water framework directive) Bertram Weiss, Verbund-Austrian Hydro Power AG (Task Leader 2.9)
     
  Pumped Hydro Strorage Otto Pirker, Verbund-Austrian Hydro Power AG (Task Leader 2.9)
     
12.00 Discussion All (Chair: Bertram Weiss, Verbund-Austrian Hydro Power AG, Task Leader 2.9)
     
12.30 Lunch  
     
  Part III – Discussion, stakeholder Participation  
     
13.30 Open discussion to the presented results, Austrian RES-Electricity, RES-H and Grid Infrastructure Strategies in the short- and medium term (up to 2020/2030) as well as in the very long term-up to 2050 All (Chair: Hans Auer, EEG, TU Wien, WP2 Leader)
     
15.00 Final conclusions Bjørn Bakken, SINTEF Energy Reseach (Coordinator SUSPLAN) and Dena (Dissemination Leader SUSPLAN)